Civil engineering work after demolition of warehouse and administration building
With precise soil improvement measures and the use of modern machinery, the site is optimally prepared for future use.
Work carried out
- Cut & fill with movement of > 80,000 tons of soil and fill material
- Soil improvement by milling in mixed lime binder over an area of approx. 20,000 square meters
- Creation of temporary asphalted access roads and parking areas
- Creation of base and frost protection layers for the planned new logistics building and the open spaces
Machines in use
- Bulldozer and tracked excavator with 3D machine control and compactor
- Spreading vehicles and self-propelled soil stabilizers
- Own construction site logistics