Conversion of a multi-storey shopping center in Gevelsberg

As part of the conversion of a multi-storey shopping center in Gevelsberg, Knepper is carrying out, among other things, the gutting and partial demolition of the sales floors.

Work carried out

  • Complete gutting of the sales floors
  • Dismantling of all floor coverings and superstructures
  • Demolition of load-bearing and non-load-bearing masonry
  • Installation of temporary steel bracing structures
  • Mechanical partial demolition of the building complex over several floors

To the service overview

Machines in use

  • Longfront demolition excavator > 28 m
  • Tracked excavators up to 30 tons with OilQuick attachments
  • Compact equipment up to 8 tons with OilQuick attachments
  • Various small equipment
  • Lifting platforms up to 15 m working height