Dismantling a calciner system
The work was carried out in 24-hour operation, including the adaptation of existing structures for the new components.
Work carried out
- Complete conceptualization of the measure and creation of a detailed dismantling concept including static inspection
- Machine-assisted dismantling of the calciner system including comprehensive disposal management
- Adaptation and enlargement of existing wall and floor openings in concrete and steel structures for the installation of the new components
Machines in use
- Tracked excavators up to 50 tons with OilQuick attachments
- Compact equipment up to 8 tons with OilQuick attachments
- Lifting platforms up to 42 m working height
- Mobile cranes up to 750 tons
- Mobile maintenance units
- Own construction site logistics