Dismantling of various system components in 24-hour operation

For this project, the team drew up a comprehensive demolition concept with a structural analysis and adapted existing wall, ceiling and floor openings.

Work carried out

  • Dismantling of various heat exchanger components, piping, partial dismantling of the VDK, electric and bag filters and dismantling of the clinker cooler
  • Complete conceptualization of the measure and creation of a detailed dismantling concept including static inspection
  • Extensive adaptation and enlargement of existing wall, ceiling and floor openings for the installation of the new components

To the service overview

Machines in use

  • Tracked excavators up to 30 tons with OilQuick attachments
  • Compact equipment up to 8 tons with OilQuick attachments
  • Lifting platforms up to 42 m working height
  • Mobile cranes up to 300 tons
  • Own construction site logistics
  • Mobile crushing and screening technology