Dismantling of a shaft furnace system and a chimney

Knepper developed a comprehensive dismantling concept for a shaft furnace system and a 60-meter-high industrial chimney and planned all measures.

Work carried out

  • Dismantling of a 60 m high steel industrial chimney and blasting of a 30 m high, statically significantly impaired shaft furnace battery
  • Complete conception of the measure and creation of a detailed dismantling concept
  • Complete dismantling and disposal of the plant including asbestos removal in accordance with TRGS 519

To the service overview

Machines in use

  • Tracked excavators up to 50 tons with OilQuick attachments
  • Lifting platforms up to 42 m working height
  • Own construction site logistics
  • Mobile crushing and screening technology