DISMANTLING OF THE FORMER PRECIOUS CHIPPINGS PLANT
Knepper impressed with its careful planning and efficient execution during the dismantling of the former high-grade chippings plant in Kallenhardt.
Work carried out
- Complete conception of the measure
- Removal, packaging and disposal of fiber cement panels
- Exposure of screening systems on the upper floor of the building for dismantling on site
- Dismantling of the building including the technology in the immediate vicinity of running systems
- Filling of the building area to bring it into line with the surrounding terrain
- Complete material flow management
Machines in use
- Longfront demolition excavator > 20 m
- Tracked excavators up to 35 tons with OilQuick attachments
- Own construction site logistics