Dismantling work on a coal grinding plant in Schelklingen

The project required both careful planning and flexible coordination of modern machinery to ensure the highest safety and environmental protection standards.

Work carried out

  • Complete design of the dismantling measure
  • Preliminary dismantling of chimneys, filters, classifiers, bunkers and conveying equipment at a height of up to 30 m above ground level in compliance with stringent explosion protection requirements
  • Dismantling of a self-supporting feeder bridge over the plant technology to be preserved in a tandem lift
  • Inertization and dismantling of the ball mill
  • Dismantling of insulation containing KMF, pipe and machine insulation in compliance with TRGS 521
  • Conventional dismantling of the building using a 33 m long front excavator and a 50 t chain excavator
  • Dismantling the floor slab and the plant/building foundations
  • Processing of the rubble into a 0/45 mineral mixture

To the service overview

Machines in use

  • Longfront demolition excavator > 30 m
  • Tracked excavators up to 50 tons with OilQuick attachments
  • Mobile cranes up to 160 tons
  • Mobile working platforms up to 40 m reach
  • Own construction site logistics
  • Mobile crushing and screening technology

Your contact person

SALES DEMOLITION AND DISMANTLING
Phone: +49 2941 2841-310
E-Mail: vertrieb@knepper-gruppe.de 