![](/images/_processed_/d/d/csm_knepper_referenz_goldclub_lippstadt_logo_9635221571.png)
Renewal of bridge support structures at Lippstadt Golf Club
Knepper renewed three bridge structures as part of this project. Modern machines were used, supported by efficient construction site logistics.
Work carried out
- Replacement of the weathered timber supports with steel girders embedded 4.5 m deep in the ground
- Lifting the bridge superstructure and replacing the wooden supports with steel girders
Machines in use
- Tracked excavators up to 30 tons with OilQuick attachments
- Compact equipment up to 8 tons with OilQuick attachments
- Own construction site logistics
Your contact person
SALES DEMOLITION AND DISMANTLING
Phone: +49 2941 2841-310
E-Mail: vertrieb@knepper-gruppe.de
Further references