Roof renovation of a production hall in Warstein

Using a selective deconstruction approach, the various structural elements of the roof and walls are carefully removed in order to preserve the remaining structure as much as possible.

Work carried out

  • Manual demolition of the roof waterproofing including insulating foams, timber cladding and wooden beams, as well as strip lighting in two construction phases
  • Mechanical demolition of the western gable wall of the central aisle of the hall, including separation of the demolished wall areas from the remaining structure
  • Demolition and disposal of the entire roof structure
  • Demolition of the interior masonry, removal and disposal of the foundations, additional soil excavation

To the service overview

Machines in use

  • Longfront demolition excavator > 20 m
  • Tracked excavator up to 30 tons with OilQuick attachments
  • Tower crane as bottom-slewing crane with 45 m
  • Compact equipment up to 8 tons with OilQuick attachments